In Genoa we design various tools and software and create the prototypes that once approved, they go to the factory for production.
Each instrument is built with customer specifications and must be on average 15-20 days for delivery.
The steps after the design are the following:
electronic cards
Foil for processing
Order components at Digikey or other suppliers
Assembly and robotic control
Programming and verification operation
Meanwhile our purchasing departments order accessories:
Geophones? Special cases, spikes, cables, Hz 2.0 - 4,5 - 10.0 - over
Mems 3C xyz on the Card
Seismic cables. Takeouts spacing?
Hammer 10kg - 5 kg + shot plate + cables trigger - rollers
transport boxes
After checking everything in the lab is the time of the inspection in the field trials.
After these tests, a report is signed and given the green light for the DELIVERY and after packaging the practice goes to foreign shipping Broker that will be DHL or TNT EXPRESS or different Cargo. The cost in Italy is CIF. FREE, for foreign countries will be charged the transport to customer.